Did you not take notes during Rick Dodge's ISS World Expo presentation about New Construction: Multi Story on April 6? Or did you miss it? What about the Expo Hall booths? Miss the ISS Expo altogether? If so, see important takeaways:

Important multi-storage systems new construction presentation takeaways:

  • A great option when your site is limited in size;
  • Two systems for multi-story construction: the load-bearing system, and the 10x10 structural system;
  • Do your homework with planning and zoning for multi-story constructed buildings;
  • A load-bearing wall system is the most cost-efficient way to build up to four stories;
  • The use of steel does not restrict in exterior finishes;
  • Standing seam roofing systems are the most widely used roofs in storage;
  • The 2012 energy code will have a major cost impact upon all self-storage construction.

ISS Expo Hall Booth #723 – insight

Do you know what were the most commonly asked questions in our booth? Rick and David Dodge were asked about:

  • Logistics
  • Design/build services
  • Budgets

Get in contact with Paramount Metal Systems to discover how we can solve your own specific self-storage needs.

Paramount Metal Systems offers design/build steel structures and roofing systems. Come, explore how we can build to serve your needs.

Established in 2004, Paramount Metal Systems is a full-service design-build contractor. Paramount Metal Systems and associates serve clients with more than one hundred fifty years of combined experience in the steel component industry. For architectural, engineering, manufacturing, construction and project management services throughout the United States, call Paramount Metal Systems today.